Sometimes contractors are required to manually verify the counts and average speeds of traffic on a lane by lane basis over a specified amount of time (e.g. 15 minutes or 100 vehicle, whichever occurs first).
To assist with this, we have a “validation tool” built into the Range Plot (live view) of the SpeedLane Configurator tool. To use this tool, watch a short video: